POTABILIZATION OF CLYPOT QUARRY WATER

Throughout 2023, we continued to recover water from quarries to supply the public distribution network. The volume of water from the Clypot quarry sent for potabilization was 1,309 thousand m3, an increase from 741 thousand m3 in 2022.

Our goal is to maximize this supply, with plans to include the Gaurain quarry in the future, potentially reaching a total of around 5,000 thousand m3. These operations enable the recovery of quarry water into the public distribution network. As a result, the local authority’s reliance on well production can be significantly reduced in high-water stress areas, such as the Gaurain and Clypot districts.

Last update: